Wellesley Township Office

Location: 4639 Lobsinger Line, Wellesley
Area: Waterloo
Size: 100 kW
Co-op Share: 100%
Lifetime Energy: 475,025 kWh
CO2 Emissions Saved: 189,630 kg

The Township of Wellesley committed to solar power, installing systems on four of their buildings. The final CED Co-op system in partnership with the Township of Wellesley is at their main office site. A 100kW system, is made up of fixed roof-top panels on both the main office and garage. The whole system feeds is tied together and feeds into the grid from one central point in the office.

Monitor this project in real time.

Solar panels on garage and ofifice